After calculating both the simple payback period and the discounted payback period for a project, the discounted payback period is:()计算一个项目的静态投资回收期和动态投资回收期后,动态投资回收期为:()

A.shorter because the time value of money raises the value of the cash flows.更短,因为货币的时间价值提高了现金流的价值

B.longer because the time value of money raises the value of the cash flows.更长,因为货币的时间价值提高了现金流的价值

C.shorter because the time value of money lowers the value of the cash flows.更短,因为货币的时间价值降低了现金流的价值

D.longer because the time value of money lowers the value of the cash flows.更长,因为货币的时间价值降低了现金流的价值。

正确答案:longer because the time value of money lowers the value of the cash flows.更长,因为货币的时间价值降低了现金流的价值。

本文链接:https://www.oyuuu.com/Ti/ZhiHuiShu/368929.html

关键字  浏览量:
上一篇:A depreciation tax shield is a reduction in income taxes折旧税盾
下一篇:DDA法圆弧插补X坐标值累加的溢出脉冲作为Y轴的进给脉冲。
相关问题
  • 【智慧树】After identifying your characters, you will add your setting
  • 【智慧树】Which is the first city that both hosted Summer and Winter O
  • 【智慧树】After five centuries of growth, o1f tusslingwith the French
  • 【智慧树】…we offer not a pledge but a request: that both sides begin
  • 【智慧树】Let both sides, for the first time, formulate serious and pr
  • 【智慧树】The ___ stroke requires the swimmers to swim with both the a
  • 【智慧树】The score of a match can be altered after the match, if late
  • 【智慧树】If a race walker’s both feet are in the air, it is called __